With African Mohogany purchased from Armstrong Millworks in Highland Michigan and Okoume plywood purchased at Public Lumber in Detroit, the frame build got started. The same layout board was used as an assembly jig. Blocks were screwed down to locate frame members so that epoxy gluing, screwing and or nailing could be done while maintaining alignments.
Building the templates for the frames
Diposting oleh ghone | | 20.09Label: boat making, Building, for, frames, templates, the
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar