Tampilkan postingan dengan label ready. Tampilkan semua postingan
Tampilkan postingan dengan label ready. Tampilkan semua postingan

Getting Ready to Head South

| 0 komentar |


Finisterra has been in her slip for the last four months undergoing some refits, improvements and upgrades in preparation for her next adventure. Here is a partial list of work done:
- 10 coats of varnish on the cap rails
- Replace the worn teak in the cockpit with synthetic teak
- Add a fourth element to the lazyjacks
- Rebuild the watermaker
- Replace the jib sheets and main halyard
- Service the ground tackle
- Install fans in all the cabins
- Modify the outboard motor hoist to make it smaller and lighter
- Install a cut-out switch between the solar panels and charge controller
- Upgrade the bimini
- Fabricate and install a new cockpit table
- Replace the XM radio antenna
- Replace all docklines
- Install spreader patches on the mainsail
- Service the diesel engine and outboard motor
- Seal the joint between the galley countertop and lockers
- Completely empty the boat and clean out all lockers
- Refresh ditch bag
- Get new bug screens for all hatches

Whew! That was a lot of work. Now all thats left is to provision, fuel up and take care of roughly a thousand other minor tasks, such as refill the propane tanks, re-certify all the safety gear, go through our wardrobes and thin them down for the tropics, install an Iridium Go satellite communications system, stock up on spare parts and tools, make copies of documentation, etc. etc.  A few of my landlocked friends tell me Im "Livin the dream", but what they dont understand is that living the dream is a lot of work!

Anyway, it looks like, barring any surprises, Finisterra will be ready to sail sometime in early November. The plan is to spend a few days at Catalina Island, another week or so in San Diego and then head for Ensenada. From there well sail down the coast of Baja California, stopping in Turtle Bay and possibly Magdalena Bay before rounding Cabo San Lucas and laying over a day or two in San Jose Del Cabo to top up provisions. From San Jose, the plan is to cross the Sea of Cortez to Mazatlan, then cruise down the coast to Puerto Vallarta where well spend a month or so and plan our next move.



Read More..

Getting ready for the chine

| 0 komentar |
      My little brother came in yesterday, and he, Ramon, and I spent the afternoon at the boat shop ripping 8"x2" rough-sawn oak into 8"x1" halves with my cheap little Harbor Freight table saw. Ill be using these for the chine lamination after running them through the thickness planer. 
      Lots of time on this build has been spent trying to morph the wood I have into the wood I want. First, for the keel I bought construction-grade Southern yellow pine which promptly warped. Ramon and I used all manner of clamp configurations to get that stuff to laminate up into semi-straight pieces. Then, I milled the frame lumber from rough sawn white oak. Ripping the full oak pieces thickness-wise has been our toughest challenge yet. My table saw doesnt quite cut through half of the 8" width so we today we ran the pieces through on each side three times so we wouldnt blow a fuse (though we did manage switch the breaker multiple times anyway) and then ran a Sawzall down the middle to finally split the thing. Overall, though, we had a great day and worked off the beer and sushi from last night.

Boatbuilding in Hindsight:
1. Pay the little bit extra to have the wood milled.
2. Get a bandsaw.
3. Id really like to have some nicer power tools for the next build, but I certainly dont regret going with the cheap stuff the first time around (particularly because my shop is so exposed to the elements).

Here the frames are squared and braced from the outside. Ill add bracing on the inside before laminating the chine, then remove the exterior bracing to install the stringers.

Read More..