The lower side stringers upto frame 8 are fitted each side

The front frames from 9 trough 15 need the backing strips fitted before we can tack them in forming the front of the boat.
today we managed to get 6 frames completed and 4 frames remain.

Backing strips welded to the inside of the frames.
there is a radius of 150mm approx.. we used the gas bottle to form it perfectly...!

Frame 13 assembled (in darkness) ready for the backing strip
0 komentar:
Posting Komentar